---
product_id: 255998275
title: "Long Lead Acid Battery (18 Ah/12 Volt)"
brand: "long"
price: "843.45 DT"
currency: TND
in_stock: true
reviews_count: 6
category: "Long"
url: https://www.desertcart.tn/products/255998275-long-lead-acid-battery-18-ah-12-volt
store_origin: TN
region: Tunisia
---

# 3-5 years floating life 12 Volt power output 18 Ah capacity Long Lead Acid Battery (18 Ah/12 Volt)

**Brand:** long
**Price:** 843.45 DT
**Availability:** ✅ In Stock

## Summary

> 🔋 Power up your peace of mind with Long Lead Acid Battery!

## Quick Answers

- **What is this?** Long Lead Acid Battery (18 Ah/12 Volt) by long
- **How much does it cost?** 843.45 DT with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.tn](https://www.desertcart.tn/products/255998275-long-lead-acid-battery-18-ah-12-volt)

## Best For

- long enthusiasts

## Why This Product

- Trusted long brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Quality Assured:** Each battery undergoes automated individual testing for flawless performance.
- • **Trusted & Affordable:** Top-ranked in automotive replacements with rave reviews for value and reliability.
- • **Reliable Power Backup:** Engineered to exceed strict manufacturer specs for seamless device compatibility.
- • **Compact & Sleek Design:** Space-saving form factor fits effortlessly into UPS, elevators, and backup systems.
- • **Long-Lasting Durability:** 3-5 years floating life ensures you stay powered through every critical moment.

## Overview

The Long Lead Acid Battery (18 Ah/12 Volt) delivers dependable, long-lasting power with a compact design ideal for UPS, elevators, and backup systems. Tested individually for quality, it offers 3-5 years of floating life, ensuring reliable performance that meets and exceeds manufacturer standards.

## Description

Long Battery Lead Acid replacement batteries meet and even exceed the strictest device's manufacturers specification needs, to ensure It's high standard quality, meaning taking care from all row material and components to the final product, tested automatically one by one. It has a long lasting work life 3-5 years floating time range. This is compatible with ups, elevators, backup power etc.

Review: Excellent and cheap - Best product as described
Review: جدا ممتازه - ممتازه وانصح فيها

## Features

- Brand: Long
- Sleek design
- Compact construction
- Seamless functionality

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B00P2A49IC |
| Battery Capacity | 18 Amp Hours |
| Battery Type | Lead Acid |
| Battery capacity | 18 Amp Hours |
| Battery cell composition | Lead Acid |
| Best Sellers Rank | #37,845 in Automotive ( See Top 100 in Automotive ) #50 in Automotive Replacement Batteries |
| Brand | LONG |
| Brand Name | LONG |
| Customer Reviews | 4.0 out of 5 stars 16 Reviews |
| Item Weight | 0.33 Pounds |
| Item weight | 0.33 Pounds |
| Manufacturer | Long |
| Manufacturer Part Number | WP18-12SHR |
| Model Number | WP18-12SHR |
| Number Of Cells | 6 |
| Number of cells | 6 |
| Unit Count | 1.0 Count |
| Voltage | 12 Volts |

## Product Details

- **Battery cell composition:** Lead Acid
- **Brand:** LONG
- **Item weight:** 0.33 Pounds
- **Number of cells:** 6
- **Voltage:** 12 Volts

## Images

![Long Lead Acid Battery (18 Ah/12 Volt) - Image 1](https://m.media-amazon.com/images/I/61t3b0iv6lL.jpg)

## Customer Reviews

### ⭐⭐⭐⭐⭐ Excellent and cheap
*by A***I on 9 September 2025*

Best product as described

### ⭐⭐⭐⭐⭐ جدا ممتازه
*by ن***ي on 1 March 2024*

ممتازه وانصح فيها

### ⭐⭐⭐⭐⭐ Very good
*by U***1 on 15 April 2026*

Very good

## Frequently Bought Together

- Long Lead Acid Battery (18 Ah/12 Volt)
- Long Battery Lead Acid AGM 9Ah/12 Volt
- Long AGM 4.5 Ah/6 Volt Battery Lead Acid

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.tn/products/255998275-long-lead-acid-battery-18-ah-12-volt](https://www.desertcart.tn/products/255998275-long-lead-acid-battery-18-ah-12-volt)

---

*Product available on Desertcart Tunisia*
*Store origin: TN*
*Last updated: 2026-06-01*