






Desertcart purchases this item on your behalf and handles shipping, customs, and support to Tunisia.
โก Charge your projects with power and precision!
This 10-pack of Cermant 450V 47ยตF aluminum electrolytic capacitors offers high voltage tolerance, large capacitance, and heat resistance up to 105ยฐC. Ideal for audio equipment, tube amplifiers, and circuit repairs, these through-hole capacitors come in a compact 16x25mm size with low leakage and stable performance, making them a must-have for professional and DIY electronics enthusiasts.
















| ASIN | B0B8HTJ23T |
| Best Sellers Rank | #25,942 in Industrial & Scientific ( See Top 100 in Industrial & Scientific ) #178 in Industrial Electrical Capacitors |
| Brand | Cermant |
| Brand Name | Cermant |
| Capacitance | 47 microfarad |
| Capacitance Tolerance | 20 |
| Customer Reviews | 4.9 out of 5 stars 30 Reviews |
| Item Dimensions W x H | 0.63"W x 0.98"H |
| Item Shape | Round |
| Manufacturer | Cermant |
| Material | Aluminum |
| Material Type | Aluminum |
| Maximum Voltage | 450 volts |
| Model | Celent_CL230-233 |
| Mounting Type | Through-Hole Mount |
| Number of Items | 10 |
| Operating Voltage | 450 volts |
| Part Number | Celent_CL230-233 |
| Shape | Round |
| Unit Count | 10 Count |
| Upper Temperature Rating | 105 ยฐC |
D**M
Pricing
Great replacement
K**N
Good quality and high voltage rating.
These seem to be very good quality capacitors, and the 450V rating is great for my hobby renovating antique radios.
C**H
Within specified tolerance and working well
Working well as replacement capacitors in an 82-year old broadcast/shortwave radio.
A**T
These test great!
I needed high voltage filter capacitors for a project. The few that I sampled out of the 10 I received were all over 47uf, and had low leakage at a little over 400V (no need for me to go higher). Seems like a great set of capacitors!
T**D
good price and quality
I keep purchasing these electrolytics. They measure in tolerance and have great filtering characteristics.
G**0
Great Cap for the Price
Item exactly as described and worked perfectly. Highly recommend.
O**E
Poor quality Control
Rated as 47uf. All 10 are 40uf.
Trustpilot
1 month ago
1 month ago